•  
  •  
  •  

Aussie Bombora to install 4-MW wave farm in Lanzarote

Source: Bombora Wave Power (www.bomborawave.com)

April 26 (Renewables Now) - India-based energy consultant Enzen Global Ltd has selected Bombora Wave Power Pty Ltd and its wave farm technology for a project off the coast of the Spanish island of Lanzarote.

In the first phase of the project, Bombora will install an array of the 1.5-MW mWave device with a total grid-connected capacity of up to 4 MW, the Australian marine energy specialist said Thursday. The submerged structure is installed on the sea floor at an angle to the incoming waves, according to Bombora’s website. Its operation will not affect the island coastline nor marine traffic. The wave farm will supply clean electricity to Lanzarote, which today largely depends on diesel fuel for power.

"Enzen and Bombora are now engaging with the local supply chain in Lanzarote to deliver the project with Bombora providing specialist engineering support from our European headquarters in Wales," said Sam Leighton, managing director of the Australian company.

The project, coordinated with the Lanzarote governing authority, is a follow-up on Bombora’s pilot currently carried out in the Marine Energy Testing Area off the coast of Pembrokeshire, Wales. The pilot project, due to be finalised next year, will run concurrently with the consenting process for the Lanzarote farm.

More stories to explore
Share this story
Tags
 
About the author

Sladjana is the newest addition to the Renewables Now team. She has significant experience as a Spain-focused business news reporter and is now diving deeper into the global renewable energy industry.

More articles by the author
5 / 5 free articles left this month
Get 5 more for free Sign up for Basic subscription
Get full access Sign up for Premium subscription